
1D-9 Engine Mechanical:
3) Disconnect the fuel injector coupler (2) and TP/IAP/
IAT sensor coupler (3).
4) Disconnect the ISC valve coupler (4).
5) Remove the throttle cable cover (5).
6) Disconnect the throttle cable.
CAUTION
!
After disconnecting the throttle cables, do
not snap the throttle valve from full open to
full close. It may cause damage to the throttle
valve and throttle body.
7) Loosen the throttle body clamp screw and remove
the throttle body assembly.
Installation
NOTE
When replacing the throttle body, turn the
ignition switch ON and OFF.
Install the throttle body in the reverse order of removal.
Pay attention to the following points:
• Install the throttle body.
NOTE
When installing the throttle body, fit the
concave part “A” of the intake pipe onto the
convex part “B” of the throttle body.
2
3
4
I831G1140020-01
5
I831G1140021-01
I831G1140025-02
I831G1140022-01
“A”
“B”
I831G1140026-01
Содержание 2009 LT-A750XK9
Страница 2: ......
Страница 4: ......
Страница 5: ...SUPPLEMENTS L LT A750XK9 09 MODEL 10 LT A750XPK9 09 MODEL 11 ...
Страница 29: ...0A 15 General Information 99565 01010 013 CD ROM Ver 13 ...
Страница 57: ...0B 28 Maintenance and Lubrication 09915 40610 Oil filter wrench Page 0B 12 Page 0B 12 ...
Страница 68: ...0C 11 Service Data ...
Страница 310: ...1K 5 Exhaust System ...
Страница 482: ...4D 6 Parking Brake ...
Страница 528: ...6B 13 Steering Handlebar ...
Страница 555: ...Exterior Parts 9D 1 Body and Accessories Exterior Parts Repair Instructions Exterior Parts Construction B831G29406001 ...
Страница 581: ......
Страница 631: ...4A 6 Brake Control System and Diagnosis ...