Engine Mechanical: 1D-10
• Connect the throttle cable.
• Tighten the throttle body clamp screws. Refer to
“Throttle Body Construction (Page 1D-8)”.
• After installed throttle cable, adjust the throttle cable
play. Refer to “Throttle Cable Play Inspection and
Adjustment in Section 0B (Page 0B-15)”.
Throttle Body Disassembly and Assembly
B831G21406011
Refer to “Throttle Body Removal and Installation
(Page 1D-9)”.
Disassembly
1) Disconnect the vacuum hose (1).
2) Remove the fuel delivery pipe assembly (2) by
removing its mounting screws.
3) Remove the fuel injector (3).
4) Remove the ISC valve (4).
I831G1140027-01
I831G1140028-01
1
I831G1140030-01
2
I831G1140031-01
3
I831G1140033-01
4
I831G1140034-01
Содержание 2009 LT-A750XK9
Страница 2: ......
Страница 4: ......
Страница 5: ...SUPPLEMENTS L LT A750XK9 09 MODEL 10 LT A750XPK9 09 MODEL 11 ...
Страница 29: ...0A 15 General Information 99565 01010 013 CD ROM Ver 13 ...
Страница 57: ...0B 28 Maintenance and Lubrication 09915 40610 Oil filter wrench Page 0B 12 Page 0B 12 ...
Страница 68: ...0C 11 Service Data ...
Страница 310: ...1K 5 Exhaust System ...
Страница 482: ...4D 6 Parking Brake ...
Страница 528: ...6B 13 Steering Handlebar ...
Страница 555: ...Exterior Parts 9D 1 Body and Accessories Exterior Parts Repair Instructions Exterior Parts Construction B831G29406001 ...
Страница 581: ......
Страница 631: ...4A 6 Brake Control System and Diagnosis ...