
9E-7 Body Structure:
Trailer Towing Construction
B831G29506009
Trailer Towing Removal and Instruction
B831G29506010
Removal
Remove the trailer towing (1).
Installation
Install the trailer towing with the trailer towing mounting
bolts and then tighten them to the specified torque.
Tightening torque
Trailer towing mounting bolt (a): 60 N·m (6.0 kgf-m,
43.5 lb-ft)
FWD
FWD
“ a ”
“ b ”
1
3
2
FWD
(a)
I831G1950020-04
1. Trailer towing warning label (P-17, 28)
: 60 N
⋅
m (6.0 kgf-m, 43.5 lb-ft)
2. Trailer towing warning label
“a“: 5 mm (0.2 in)
3. Trailer towing
“b“: 30 mm (1.2 in)
1
I831G1950021-01
(a)
I831G1950022-01
Содержание 2009 LT-A750XK9
Страница 2: ......
Страница 4: ......
Страница 5: ...SUPPLEMENTS L LT A750XK9 09 MODEL 10 LT A750XPK9 09 MODEL 11 ...
Страница 29: ...0A 15 General Information 99565 01010 013 CD ROM Ver 13 ...
Страница 57: ...0B 28 Maintenance and Lubrication 09915 40610 Oil filter wrench Page 0B 12 Page 0B 12 ...
Страница 68: ...0C 11 Service Data ...
Страница 310: ...1K 5 Exhaust System ...
Страница 482: ...4D 6 Parking Brake ...
Страница 528: ...6B 13 Steering Handlebar ...
Страница 555: ...Exterior Parts 9D 1 Body and Accessories Exterior Parts Repair Instructions Exterior Parts Construction B831G29406001 ...
Страница 581: ......
Страница 631: ...4A 6 Brake Control System and Diagnosis ...