14
Sun Blade X8400 Server Module Installation Guide • March 2008
Note –
The DIMMs must be inserted evenly, straight down into the DIMM
connector slot, until the ejector levers lock into place
.
7. Verify that the DIMM ejector levers are upright, seated, and tight. Press on the
ejector levers to ensure that they are engaged properly.
8. To install the second DIMM, repeat Steps 4 through 7.
9. To reinstall the server module cover, slide the cover under the tabs at the front
of the server module, then reinstall and tighten all screws.
Figure Legend
1. DIMM Connector Slot
2. DIMM Connector Key
3. DIMM Lever