23
Treatment type
Preventive
Curative
When using chemicals or any kind of
additions
:
Follow the instructions provided by the
manufacturer.
Read the suppliers manual for the
maximum allowable level/mixing ratio
that can be used with the boiler. Warranty
will be void if these instructions are not
followed exactly.
Record the used products and mixing
ratio in the log book, start-up-, check- and
maintenance list.
Protector F1
X
Cleaner F3
X
X
X100
X
X200
X
X300
X
X400
X
X500
X
Alphi 11
X
Leaker Sealer F4
X
Sotin 212
X
MC1+
x
7.14 Flush the system with fresh water
The water of the boiler and heating circuit should be free of any particles, debris and pollution. Therefore, the
complete installation must always be thoroughly flushed with clean water before installing and using the boiler(s).
7.15 Plastic piping in the heating system
When plastic pipes with no oxygen barrier e.g. under-floor heating system, are used in the central heating system,
these should be separated from the boiler system by using a plate heat exchanger. Diffusion (through the plastic)
can cause air to enter the heating system. This could damage the boiler, pumps and other components in the
system. Be aware that plastic piping is often used in under floor heating systems. When no measures have been
taken to prevent the entrance of air into the boiler system, the warranty of the boiler and any boiler part may be
deemed invalid.
Содержание S-CBX 105
Страница 2: ......
Страница 40: ...40 9 10 Flue Terminal Positioning ...
Страница 42: ...42 9 11 1 FIGURE 12 LINE G ...
Страница 55: ...55 11 5 Ladder Logic Diagram ...
Страница 56: ...56 11 6 Electrical schematics ...
Страница 57: ...57 ...
Страница 137: ......