3-4
Site Preparation
Chapter 3 - Installation
STARPLUS STSe - Installation Manual
August 2005
Distance Parameters
-- The system location should be within 25 feet of the telephone
company’s termination point. Also, the location should be within the prescribed station loop
lengths for all keysets and terminals. If existing cabling is used, its location and conduits should
be considered. Station wiring should be in the building. Station ports are not designed for
installation outside of the building.
Accessibility
-- The location should have adequate accessibility, space, and lighting for future
servicing and should consider the need for future expansion.
Hazard Protection
-- The system should be located in an area that is protected from flooding,
flammable materials, excessive dust and vibration.
Interference
-- The site should be away from radio transmitting equipment, arc-welding
devices, copying machines, and other electrical equipment that are capable of generating
electrical
interferences. Operation of this equipment in a residential area is likely to cause
interference. In which case the user, at his own expense, is required to take any necessary
measures to correct the interference.
Backboard Installation
Material
-- A wooden backboard is recommended for all installations and must be installed
when the location has masonry or plasterboard walls. A minimum of ½-inch plywood material
is sufficient for most installations.
Placement
-- The backboard should be mounted at a convenient height, about three feet
above the floor and be bolted in various places to distribute the weight of the system.
Clearance
-- Space should be available on the bottom side of the backboard for the MDF
cabling and for optional equipment such as a music source, battery backup, etc.
System Layout
-- It is recommended that the location of each major item be roughly sketched
on the backboard as an installation layout.
Verify On-Site Equipment
Once the equipment installation site is identified and a dedicated AC outlet, earth ground, and
lighting and ventilation are available:
1. Verify that all equipment required is on-site and was not damaged during shipment.
2. Unpack the KSUs to assure there is no shipping damage.
3. Notice that a mounting template is packed with the BKSU; this template is required later
in the installation.
4. Check that the type and quantity of boards received is correct and optional equipment
and a Power Line Surge Protector are on-site.
It is not necessary to unpack the individual boards at this time.
If any equipment is damaged or missing, notify the appropriate personnel to
correct the situation.
Содержание STSe Key System
Страница 1: ...August 2005 Issue 1 0 STARPLUS STSe Key Systems Installation Manual TM...
Страница 4: ......
Страница 10: ...vi Figures STARPLUS STSe Installation Manual August 2005...
Страница 12: ...viii Tables STARPLUS STSe Installation Manual August 2005...
Страница 14: ...N O T E S...
Страница 22: ...N O T E S...
Страница 30: ...N O T E S...
Страница 68: ...3 40 Door Box Chapter 3 Installation STARPLUS STSe Installation Manual August 2005...
Страница 70: ...N O T E S...
Страница 94: ...iv Index STARPLUS STSe Installation Manual August 2005...