![Spectris Particle Measuring Systems LiQuilaz II E Скачать руководство пользователя страница 37](http://html.mh-extra.com/html/spectris/particle-measuring-systems-liquilaz-ii-e/particle-measuring-systems-liquilaz-ii-e_operation-manual_1344043037.webp)
Page 3-10
LiQuilaz II E and S Operations Manual
Chapter 3 Maintenance
Calibration
If you are using SamplerSight-Pharma as your user interface, you can calibrate the
LiQuilaz II E20, LiQuilaz II E20P and LiQuilaz II E15P instruments. Refer to the
Calibration chapter in the
SamplerSight-Pharma User Guide
.
Otherwise, contact Particle Measuring Systems Service.
Fuses
The following procedure applies to all LiQuilaz II models.
Required items:
• Small flat-bladed tool such as a small screw driver
• Fuses: 250 V~, 5 x 20 mm, T, 0.75 A
>> To replace the fuses:
1.
Use the LiQuilaz II Liquid Particle Counter power switch (located where the power
cable connects) to turn off power.
2.
Disconnect the power cable from the particle counter’s power entry module.
NOTE:
The black plastic assembly that the power cable connects to is called the
power entry module
. The power entry module also contains the fuse tray.
3.
Use a tool like a flat-bladed screwdriver to open the fuse tray on the power entry
module.
4.
Remove the old fuses.
5.
Install the correct replacement fuses.
6.
Replace the fuse receptacle covers.
7.
Restore power.
WARNING
Disconnect the power cord from its power source.
Содержание Particle Measuring Systems LiQuilaz II E
Страница 9: ...viii LiQuilaz II E and S Operations Manual This page is intentionally left blank ...
Страница 15: ...Page 1 4 LiQuilaz II E and S Operations Manual Chapter 1 Getting Started This page is intentionally left blank ...
Страница 105: ...Page H 2 LiQuilaz II E and S Operations Manual Appendix H 㦘㹡㒥㦘 䤓䓸德 侯 This page is intentionally left blank ...