![Spectris Particle Measuring Systems LiQuilaz II E Скачать руководство пользователя страница 36](http://html.mh-extra.com/html/spectris/particle-measuring-systems-liquilaz-ii-e/particle-measuring-systems-liquilaz-ii-e_operation-manual_1344043036.webp)
Chapter 3 Maintenance
LiQuilaz II E and S Operations Manual
Page 3-9
10.
After 10-15 seconds of flossing action, remove the Super Floss from the capillary.
Remember to remove the floss from the same direction that it was inserted.
Do NOT pull the waxed-end through the capillary.
11.
Reconnect the bottom fitting to the capillary mount using the 3-prong wrench,
followed by the top fitting. The fitting should be snug (2 in-lbs), but do not
overtighten.
12.
Check for correct alignment of the fitting inside capillary mount. Ensure the locking
pin can be inserted.
NOTE:
If you are having trouble with alignment, gently tighten the
fitting. Do not loosen.
Figure 3-10
Hole alignment for locking pin insertion
13.
Insert the locking pins into each fitting.
14.
Connect the liquid particle counter inlet to a source of ultra-pure, deionized water.
15.
Direct the liquid particle counter outlet to a drain suitable for cleaning fluid.
16.
Flush cleaning fluid from the liquid particle counter with DI water for 3-5 minutes.
a.
Check all fittings for leaks. Correct as required prior to testing unit on chemicals.
17.
Check the DC Light using the provided software.
• If the DC Light fails to meet the following sensor specifications, repeat cleaning
with one additional strand of Super Floss.
• If the DC light still does not meet sensor specifications, return the LiQuilaz II
Liquid Particle Counter to Particle Measuring Systems Service Department.
DC Light Specifications
LiQuilaz II S liquid particle counter, model S02
< 0.5 Volts
LiQuilaz II S liquid particle counter, model S03/S05
< 0.05 Volts
LiQuilaz II E liquid particle counter, all models
> 7 Volts
Содержание Particle Measuring Systems LiQuilaz II E
Страница 9: ...viii LiQuilaz II E and S Operations Manual This page is intentionally left blank ...
Страница 15: ...Page 1 4 LiQuilaz II E and S Operations Manual Chapter 1 Getting Started This page is intentionally left blank ...
Страница 105: ...Page H 2 LiQuilaz II E and S Operations Manual Appendix H 㦘㹡㒥㦘 䤓䓸德 侯 This page is intentionally left blank ...