![Spectris Particle Measuring Systems LiQuilaz II E Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/spectris/particle-measuring-systems-liquilaz-ii-e/particle-measuring-systems-liquilaz-ii-e_operation-manual_1344043025.webp)
Page 2-10
LiQuilaz II E and S Operations Manual
Chapter 2 Unpacking and Connection
8.
Connect the flared output tube end to the left Flaretek fitting.
FlareTek fittings
IN
OUT
3 mm zero dead
volume fitting
Figure 2-14
LiQuilaz II tube connections
9.
Connect the input tube to the process line.
10.
Connect the output tube to an appropriate flow control device capable of
controlling the sample flow rate to the specified sensor flow rate.
NOTE:
Installation set-up and procedures must follow the appropriate
chemical safety regulations for your facility.
NOTE:
The flow control/device must be made of material compatible with
the specific fluid or chemical being sampled.
11.
Ensure the liquid particle counter power switch is in the
OFF
position.
12.
Connect the power cable from the liquid particle counter to an appropriate power
source.
13.
Put the liquid particle counter’s power switch to the
ON
position.
Содержание Particle Measuring Systems LiQuilaz II E
Страница 9: ...viii LiQuilaz II E and S Operations Manual This page is intentionally left blank ...
Страница 15: ...Page 1 4 LiQuilaz II E and S Operations Manual Chapter 1 Getting Started This page is intentionally left blank ...
Страница 105: ...Page H 2 LiQuilaz II E and S Operations Manual Appendix H 㦘㹡㒥㦘 䤓䓸德 侯 This page is intentionally left blank ...