SpectraLink
Link 150 Installation and Operation
12/28/98
70
J.ROLM System
This appendix describes the recommended programming to use the Link 150 with a
ROLM system. The document assumes:
•
The ROLM system is ROLM 8000, 9000, 9751, or 9006.
•
The ROLM system is installed and operational.
•
A trained Siemens-ROLM technician will be on site with the Installer to program the
system.
These procedures will help you to set up the SpectraLink wireless telephones to operate in
a way that feels familiar and comfortable to users.
1. ROLM Wiring
The Siemens-ROLM Technician should provide a modular (RJ11) jack for each ROLM
port that will be connected to a SpectraLink phone.
•
On 8000 and 9000 CBX and some 9751 CBX switches, the interface is a
ROLMPhone Interface (RPI).
•
On most 9751 CBX, 9200 CBX, and HiCom 300 switches, the interface is an SLMR
card.
The ROLM digital station port is a two-wire digital circuit. Use a straight-through phone
cord with RJ11 plugs to connect the MCR45x MCU phone lines to ROLM modular jacks.
2. Programming Considerations
Before installation, the parameters of the wired phones should be verified to plan the
parameters required for the SpectraLink phones.
•
Line Assignment - the SpectraLink phone supports a total of nine line resources.
Which lines should ring at this phone?
•
Extensions – which extensions will be assigned to the wireless telephones?
•
Message waiting - does voice mail turn on a message waiting light for this wireless
telephone?
•
Class of Service - to which Class of Service should SpectraLink wireless telephones
be assigned?
•
Extension Routing - where is this phone forwarded on busy/no answer?
•
Pickup Group - to which group does this phone or group of phones belong?
•
Programmable Buttons – The wireless telephone supports nine features accessed
through the FCN key. Determine which features, if any, should be programmed on the
SpectraLink phones. The Siemens-ROLM technician will create a template table for
each unique button layout.
Содержание Link 150
Страница 16: ...SpectraLink Link 150 Installation and Operation 12 28 98 8 ...
Страница 22: ...SpectraLink Link 150 Installation and Operation 12 28 98 14 ...
Страница 32: ...SpectraLink Link 150 Installation and Operation 12 28 98 24 ...
Страница 34: ...SpectraLink Link 150 Installation and Operation 12 28 98 26 ...
Страница 41: ...SpectraLink Link 150 Installation and Operation 12 28 98 33 Appendices ...
Страница 42: ...SpectraLink Link 150 Installation and Operation 12 28 98 34 ...
Страница 46: ...SpectraLink Link 150 Installation and Operation 12 28 98 38 ...
Страница 72: ...SpectraLink Link 150 Installation and Operation 12 28 98 64 ...
Страница 85: ...SpectraLink Link 150 Installation and Operation 12 28 98 77 ...
Страница 87: ...SpectraLink Link 150 Installation and Operation 12 28 98 79 ...