SpectraLink
Link 150 Installation and Operation
12/28/98
18
3.
Apply power to the units.
−
After a short time each MCU should display its box ID number, 1 for the
first, 2 for the second and so on.
−
If the box ID is not 1, 2, 3, or 4, refer to 8.1 Troubleshoot Error for help.
−
If the box ID is not displayed or if a box ID number is duplicated, there is
most likely a problem with the IPC cabling.
5.3.2 Connect MCU to Base Station Wiring
Connect each Base Station cable to the correct Base Station port on the back of the MCU.
The Base Stations should be evenly distributed among the MCUs.
5.4 Install Base Stations
Be sure the Base Station is positioned clear of anything that might damage it. The Base
Station should be well above head height, away from doors and other objects that might
strike it, and away from areas open to the elements or possible water leaks.
Check your location for other radio antenna devices and place the Base Stations to avoid
interference. Leave enough slack wire to account for possible future Base Station moves.
5.4.1 Mount Base Stations on Dropped Tile Ceilings
A ceiling clip and plastic bolt are supplied to install Base Stations on the drop ceiling rails
(T-bars) used to support acoustical tile. The plastic bolt screws into the top of the Base
Station, then snaps into the ceiling clip which has been attached to the rails that hold the
acoustical tile. The fastener is designed for use on 15/16" wide rails.
1.
Attach the metal fastener to the rail (T-bar) supporting the dropped ceiling by
rotating it into position until it snaps into the locked position.
2.
Screw the plastic bolt to the 1/4 x 20 captive nut into the top of the Base Station.
3.
Slide the bolt into the exposed prongs of the metal clip until it snaps into position.
When
properly attached the Base Station should sit almost flush against the ceiling and
be tightly attached to the clip and T-bar grid work.
Содержание Link 150
Страница 16: ...SpectraLink Link 150 Installation and Operation 12 28 98 8 ...
Страница 22: ...SpectraLink Link 150 Installation and Operation 12 28 98 14 ...
Страница 32: ...SpectraLink Link 150 Installation and Operation 12 28 98 24 ...
Страница 34: ...SpectraLink Link 150 Installation and Operation 12 28 98 26 ...
Страница 41: ...SpectraLink Link 150 Installation and Operation 12 28 98 33 Appendices ...
Страница 42: ...SpectraLink Link 150 Installation and Operation 12 28 98 34 ...
Страница 46: ...SpectraLink Link 150 Installation and Operation 12 28 98 38 ...
Страница 72: ...SpectraLink Link 150 Installation and Operation 12 28 98 64 ...
Страница 85: ...SpectraLink Link 150 Installation and Operation 12 28 98 77 ...
Страница 87: ...SpectraLink Link 150 Installation and Operation 12 28 98 79 ...