Attachment of Devices During Service
■
If you plan to interact with the system console directly, you can connect additional external
devices, such as a mouse and keyboard, to the server's USB connectors.
■
If you plan to connect to the Oracle ILOM software over the network, connect an Ethernet
cable to the Ethernet port labeled NET MGT.
Note -
The SP uses the NET MGT (out-of-band) port by default. You can configure the SP
to share one of the server's four Ethernet ports instead. The SP uses only the configured
Ethernet port.
■
If you plan to access the Oracle ILOM CLI through the management port, connect a serial
null modem cable to the RJ-45 serial port labeled SER MGT.
■
The USB connectors on the front panel support USB 2.0.
Related Information
■
“Front Panel Components with Eight Drives” on page 11
■
“Rear Panel Components” on page 19
■
“Detecting and Managing Faults” on page 27
■
SPARC S7-2L Server Installation Guide
Preparing for Service
63
Содержание S7-2L
Страница 1: ...SPARC S7 2L Server Service Manual Part No E73201 04 March 2017...
Страница 2: ......
Страница 10: ...10 SPARC S7 2L Server Service Manual March 2017...
Страница 25: ...Device Paths Internal Component Locations on page 20 Device Paths on page 23 Identifying Components 25...
Страница 26: ...26 SPARC S7 2L Server Service Manual March 2017...
Страница 44: ...44 SPARC S7 2L Server Service Manual March 2017...
Страница 61: ...Remove the Fan Cover Use a T6 Torx screwdriver Preparing for Service 61...
Страница 64: ...64 SPARC S7 2L Server Service Manual March 2017...
Страница 76: ...76 SPARC S7 2L Server Service Manual March 2017...
Страница 86: ...86 SPARC S7 2L Server Service Manual March 2017...
Страница 92: ...Verify a Power Supply Rear Panel Components on page 19 92 SPARC S7 2L Server Service Manual March 2017...
Страница 156: ...156 SPARC S7 2L Server Service Manual March 2017...