CSM-200
7-1
Section 7
Operation Check
When all of the installation works are complete, perform the system initialization operation test using the
test menu of the MMT (Monitoring and Maintenance Terminal) display.
A test program for installation of Drive 1, 2 is available on PSC to perform operation test.
Prepare one cartridge (compatible with the installed drives) on which barcode label is attached for the test
program.
SAIT1: SAIT1-500
SAIT2: SAIT2-800
LTO3: LTX400G
LTO4: LTX800G
LTO5: LTX1500G
Upon completion of the operation test, output the System Information data and save it.
7-1. Confirming Operation
1.
Turn on all the power supplies of PetaSite main unit.
n
There are two types of the CSM-200 depending on the internal power supply system; one type of the
CSM-200 contains a single power supply while the other type contains the dual power supplies.
Refer to the illustration below to turn on the power supplies correctly.
For the CSM-200 that contains the single power input system
Turn on the switches
1
through
6
shown in the figure.
For the CSM-200 that contains the dual power input systems
Turn on the switches
3
through
6
shown in the figure.
Single power input system
Dual power input systems
ON
OFF
ON
OFF
1
2
3
6
4
5
3
6
4
5
Содержание CSM-100BF
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 18: ......
Страница 24: ...CSM 200 4 6 Rear door 2 Open the rear door ...
Страница 150: ......
Страница 160: ...CSM 200 6 10 Sample circuit 24V Relay UPS side CB 121 side Signal from UPS Peta Site Robot Harness CB UPS ...