4-65
CSM-200
When the Proliant DL360 G4/Proliant DL360 G4p made by HP is included
1.
Unpack the PCU main unit.
2.
Take the KM extension cable and the monitor extension cable out from the accessory box.
3.
Open the front door (lower) of the console. (Refer to “4-2-1. Opening the Outer Cabinets”)
4.
Install the rails supplied with the PCU to the PCU main unit.
(1) Align the protrusions on the PCU main unit with the holes on the rails.
(2) Press the rails on the PCU and slide them toward the rear side of the PCU to lock them.
5.
Install the PCU rail into the rail that has already been installed earlier in the console. Then, push the
PCU into the console.
6.
Tighten the PCU fixing screw and secure the PCU in the console.
Rail
PCU
Rail
Fixed screws
PCU
Содержание CSM-100BF
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 18: ......
Страница 24: ...CSM 200 4 6 Rear door 2 Open the rear door ...
Страница 150: ......
Страница 160: ...CSM 200 6 10 Sample circuit 24V Relay UPS side CB 121 side Signal from UPS Peta Site Robot Harness CB UPS ...