1-41
FVS-1000 MMP1
Installation
(3) Install the 8P integrating sphere to the gate base (35) assembly using the two one-touch screws
1
.
(4) Install the gate base (35) assembly to the FVS-1000.
(5) Perform the electrical adjustment
After installation, perform Section 6-6-2 “35 mm Integrating Sphere Offset/Gain Adjustment” and
Section 6-6-3 “16 mm/8P Integrating Sphere Adjustment”
These adjustments should be performed when the integrating sphere is attached in the unit for the first
time, the mounted circuit board inside the integrating sphere is replaced or the lamp is replaced.
3. Slide Adaptor Installation
Align the two pins of the gate base (35) assembly with two holes of slide adaptor, and place the slide
adaptor on the gate base (35) assembly.
1-11. Installation of Optional Units
Gate base (35) assembly
Screw
1
Screw
1
8P integrating sphere
Gate base (35) assembly
Gate base (35) assembly
Retainer (35) assembly
Slide adaptor
Pins
Holes
Slide adaptor
Содержание BKFV-100/1
Страница 4: ......
Страница 10: ......
Страница 68: ......
Страница 72: ...2 4 FVS 1000 MMP1 1 1 1 1 1 7 6 8 9 1 1 5 4 2 3 Rear side 2 3 Location of Main Parts FVS T1000 Rear panel ...
Страница 78: ...2 10 FVS 1000 MMP1 4 5 6 8 8 9 7 3 2 1 Front side 2 3 4 Location of Sensors 2 3 Location of Main Parts ...
Страница 130: ......
Страница 194: ......
Страница 202: ......
Страница 248: ...7 4 FVS 1000 MMP1 O A 8321 649 E FILTER ASSY BOX S 1 758 295 11 IR UV CUT FILTER S 1 517 872 11 LAMP WITH PLASTIC CASE ...
Страница 250: ......
Страница 256: ......
Страница 258: ...Printed in Japan Sony Corporation 2001 12 08 B P Company 1999 FVS T1000 UC FVS P1000 SY E 3 202 167 04 ...