HRX-OM-M005
Chapter 7 Product Maintenance
7.4 Periodic Replacement Parts
HRZD Series
7-6
7.3.2
Draining of facility water
1.
Place the drain pan underneath the
piping connections on the rear of the
product.
At least a 7L capacity drain pan is required.
2.
Remove facility water piping.
Remove the joints such as unions if present.
3.
Drain the facility water using the facility water inlet port.
7.4 Periodic Replacement Parts
Replacement of consumables listed in the following table is recommended.
Contact the product supplier for request of part replacement.
Table 7-4 Periodic Replacement Part List
Part
Recommended replacement
cycle
Internal pump
Every 3 yrs
Circulating pump
Every 3 yrs
Ventilating fan
Every 3 yrs
Compressor inverter cooling fan
Every 3 yrs
Circulating pump inverter fan
Every 3 yrs
* Note: A replacement cycle may vary with your usage condition.
Figure 7-3 Drain Pan Attachment
Rear
Drain pan
Facility water outlet
Facility water inlet
Max. 10cm
Be sure to drain the facility water only when it is at room temperature.
Trapped fluid inside the product can still be hot. Potential burns can
occur if disregarded.
Содержание HRZD020-W1S-W1S
Страница 24: ...HRX OM M005 Chapter 2 Name of Each Section 2 1 Name of Each Section HRZD Series 2 2 ...
Страница 44: ...HRX OM M005 Chapter 4 Product Startup and Shutdown 4 5 Product Startup and Shutdown HRZD Series 4 6 ...
Страница 98: ...HRX OM M005 Chapter 5 Product Operation 5 3 Operation Screen HRZD Series 5 54 ...
Страница 128: ...HRX OM M005 Chapter 8 Appendix 8 8 Thermo Chiller Daily Inspection Sheet HRZD Series 8 20 ...