Section 5 – Procedures
Wear Pad Replacement
4.
Use new pop rivets to attach two new thick and
long wear pads (
234171
) to the front of the mast.
5.
Pull the mast cable out of mast 1 and lower it
between mast 4 and mast 5.
6.
Use the screws removed earlier to mount the
mast electrical housing to the side of mast 5.
7.
Use new pop rivets and the washers removed
earlier to mount the AC outlet box to the side of
mast 5.