99
SJ20
238886ABA
Section 5 – Procedures
Wear Pad Replacement
5.13-6 Install the masts 2 through 4 and
bottom wear pads
1.
Lubricate the four wear pads and the two front
corners all the way down mast 1.
2.
Use lifting straps to put mast 2 onto mast 1. Make
sure the holding valve cutout faces the rear of the
machine.
3.
Keep mast 2 raised so that the bottom part is
visible.
4.
Use new thread rolling screws to attach two new
thin and short wear pads (
234169
) to the rear of
the mast.
5.
Use new pop rivets to attach two new thick and
long wear pads (
234171
) to the front of the mast.
Содержание SJ20
Страница 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Страница 4: ...4 SJ20 238886ABA Notes...
Страница 8: ...8 SJ20 238886ABA Notes...
Страница 22: ...22 SJ20 238886ABA Notes...
Страница 32: ...32 SJ20 238886ABA Notes...
Страница 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Страница 54: ...54 SJ20 238886ABA Notes...
Страница 106: ...106 SJ20 238886ABA Notes...
Страница 107: ......
Страница 108: ...www skyjack com...