97
SJ20
238886ABA
Section 5 – Procedures
Wear Pad Replacement
5.13-4 Replace the top wear pads
1.
Remove and discard the wear pads at the top of
mast 1.
2.
Use new pop rivets to attach two new thick and
short wear pads (
234170
) to the front of the mast.
3.
Use new pop rivets to attach two new thin and
long wear pads (
234168
) to the rear of the mast.
4.
Repeat steps 2 and 3 for masts 2 through 4.
Содержание SJ20
Страница 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Страница 4: ...4 SJ20 238886ABA Notes...
Страница 8: ...8 SJ20 238886ABA Notes...
Страница 22: ...22 SJ20 238886ABA Notes...
Страница 32: ...32 SJ20 238886ABA Notes...
Страница 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Страница 54: ...54 SJ20 238886ABA Notes...
Страница 106: ...106 SJ20 238886ABA Notes...
Страница 107: ......
Страница 108: ...www skyjack com...