85
SJ20
238886ABA
Section 5 – Procedures
Lift Cylinder Installation
5.10 Lift Cylinder Installation
1.
Use lifting straps to raise the lift cylinder and
install it inside the mast. Make sure the holding
valve coil faces the rear of the machine.
2.
Use the bolts and washers removed earlier to
secure the lift cylinder from the bottom of the
chassis.
3.
Connect the hydraulic hose to the holding valve
fitting.
4.
Install the hex standoff and red knob on the
holding valve manifold.
Содержание SJ20
Страница 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Страница 4: ...4 SJ20 238886ABA Notes...
Страница 8: ...8 SJ20 238886ABA Notes...
Страница 22: ...22 SJ20 238886ABA Notes...
Страница 32: ...32 SJ20 238886ABA Notes...
Страница 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Страница 54: ...54 SJ20 238886ABA Notes...
Страница 106: ...106 SJ20 238886ABA Notes...
Страница 107: ......
Страница 108: ...www skyjack com...