90
SJ20
238886ABA
Section 5 – Procedures
Mast and Lift Cylinder Installation
6.
Route the mast cable and AC power cable
towards the hole below the chassis.
7.
Open the service compartment cover.
8.
Connect the mast electrical connector to the main
harness.
9.
Use tie wraps to secure the mast cable to the
existing cable bundles.
10.
Route the AC power cable towards the rear of the
machine and out the AC inlet hole.
11.
Connect the AC power cable to the inlet.
▪
Green wire to the green terminal
▪
Black wire to the bronze terminal
▪
White wire to the silver terminal
12.
Use new pop rivets to secure the AC inlet to the
chassis.
Содержание SJ20
Страница 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Страница 4: ...4 SJ20 238886ABA Notes...
Страница 8: ...8 SJ20 238886ABA Notes...
Страница 22: ...22 SJ20 238886ABA Notes...
Страница 32: ...32 SJ20 238886ABA Notes...
Страница 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Страница 54: ...54 SJ20 238886ABA Notes...
Страница 106: ...106 SJ20 238886ABA Notes...
Страница 107: ......
Страница 108: ...www skyjack com...