91
SJ20
238886ABA
Section 5 – Procedures
Mast and Lift Cylinder Installation
13.
Use the nut removed earlier to secure the green
ground wire from the AC inlet to the chassis
14.
Use tie wraps to secure the AC power cable to the
existing cable bundles.
15.
Install the platform. Refer to section
5.8 Platform
Installation
.
Содержание SJ20
Страница 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Страница 4: ...4 SJ20 238886ABA Notes...
Страница 8: ...8 SJ20 238886ABA Notes...
Страница 22: ...22 SJ20 238886ABA Notes...
Страница 32: ...32 SJ20 238886ABA Notes...
Страница 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Страница 54: ...54 SJ20 238886ABA Notes...
Страница 106: ...106 SJ20 238886ABA Notes...
Страница 107: ......
Страница 108: ...www skyjack com...