Section 5 – Procedures
Platform Installation
6.
Install the traverse platform onto the lower
platform. Do not push in the platform fully so you
can install the front rollers.
7.
Insert the front rollers between the traverse
platform and the lower platform.
8.
Use the bolts and washers removed earlier to
secure the front rollers.
9.
Push the platform in fully.
10.
Use a screwdriver to open the mast electrical
housing so you can see the wire connections.
11.
Loose the strain relief from the bottom of the
housing and insert the limit switch wires.
12.
Connect the limit switch wires to the mast
electrical housing. Refer to section
3.12 Base Limit
Switch
for the correct wire connections.
13.
Connect the platform control cable to the mast
electrical housing.
Содержание SJ20
Страница 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Страница 4: ...4 SJ20 238886ABA Notes...
Страница 8: ...8 SJ20 238886ABA Notes...
Страница 22: ...22 SJ20 238886ABA Notes...
Страница 32: ...32 SJ20 238886ABA Notes...
Страница 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Страница 54: ...54 SJ20 238886ABA Notes...
Страница 106: ...106 SJ20 238886ABA Notes...
Страница 107: ......
Страница 108: ...www skyjack com...