81
SJ20
238886ABA
Section 5 – Procedures
Platform Installation
5.8 Platform Installation
1.
Use an appropriate lifting device or a second
person to help install the lower platform.
2.
Tilt the platform towards the chassis.
3.
Use the bolts and nuts removed earlier to secure
the lower platform to the mast load cells.
4.
Use the screws removed earlier to secure the
junction box to the lower platform.
5.
Connect the junction box connector to the mast
electrical connector.
Содержание SJ20
Страница 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Страница 4: ...4 SJ20 238886ABA Notes...
Страница 8: ...8 SJ20 238886ABA Notes...
Страница 22: ...22 SJ20 238886ABA Notes...
Страница 32: ...32 SJ20 238886ABA Notes...
Страница 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Страница 54: ...54 SJ20 238886ABA Notes...
Страница 106: ...106 SJ20 238886ABA Notes...
Страница 107: ......
Страница 108: ...www skyjack com...