89
SJ20
238886ABA
Section 5 – Procedures
Mast and Lift Cylinder Installation
5.12 Mast and Lift Cylinder
Installation
1.
Use lifting straps and hoist rings to raise the mast
and lift cylinder and install it onto the chassis.
Make sure the holding valve coil faces the rear of
the machine.
2.
Use the bolts and washers removed earlier to
secure the mast assembly to the chassis.
3.
Connect the hydraulic hose to the holding valve
fitting.
4.
Install the hex standoff and red knob on the
holding valve manifold.
5.
Connect the electrical connector to the holding
valve coil.
Содержание SJ20
Страница 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Страница 4: ...4 SJ20 238886ABA Notes...
Страница 8: ...8 SJ20 238886ABA Notes...
Страница 22: ...22 SJ20 238886ABA Notes...
Страница 32: ...32 SJ20 238886ABA Notes...
Страница 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Страница 54: ...54 SJ20 238886ABA Notes...
Страница 106: ...106 SJ20 238886ABA Notes...
Страница 107: ......
Страница 108: ...www skyjack com...