78
SJ20
238886ABA
Section 5 – Procedures
Platform Removal
5.7 Platform Removal
1.
Disconnect the platform control cable from the
mast electrical housing.
2.
Use a screwdriver to open the housing so you
can see the wire connections.
3.
Remove the limit switch connections from the
mast electrical housing.
4.
Loosen the strain relief from the bottom of the
housing and pull out the limit switch wires.
5.
Attach the platform control and limit switch
cables to the platform railing using tie wraps.
6.
Remove and set aside the three bolts that secure
the traverse platform to the lower platform.
7.
Extend the platform a little bit so you can access
the front rollers.
8.
Remove and set aside the two front rollers.
Содержание SJ20
Страница 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Страница 4: ...4 SJ20 238886ABA Notes...
Страница 8: ...8 SJ20 238886ABA Notes...
Страница 22: ...22 SJ20 238886ABA Notes...
Страница 32: ...32 SJ20 238886ABA Notes...
Страница 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Страница 54: ...54 SJ20 238886ABA Notes...
Страница 106: ...106 SJ20 238886ABA Notes...
Страница 107: ......
Страница 108: ...www skyjack com...