![Simrad SH80 - REV C Скачать руководство пользователя страница 123](http://html1.mh-extra.com/html/simrad/sh80-rev-c/sh80-rev-c_installation-manual_1279224123.webp)
Start-up procedures
107
851-164300 / C
Checking the sonar room functions
Note
This procedure must be performed simultanously with the
procedure and checklist in the previous chapter;
Checking the
bridge functions
.
The instructions marked
Bridge:
are performed on the bridge.
Note that these procedures are more detailed that what is presented
here.
1
Check that the depth under the keel is sufficient to safely
lower the transducer.
2
Bridge:
Start the sonar.
3
Press the black button marked
1
on the motor overload
switch
S301
in the Motor Control Unit.
4
Set the hoist / lower switch
S302
in the Motor Control Unit
to
Remote.
a
Notify the bridge to perform the next step.
5
Bridge:
Lower the transducer to its middle position.
6
Bridge:
Lower the transducer to is lower position.
7
Bridge:
Hoist the transducer to its middle position.
8
Bridge:
Hoist the transducer to its upper position.
9
Bridge:
Lower the transducer to is lower position.
10
Bridge:
Hoist the transducer to its upper position.
11
Set the hoisting/lowering switch
S302
in the Motor Control
unit to the
Stop
position.
a
Notify the bridge to perform the next step.
12
Bridge:
Switch off the sonar.
Содержание SH80 - REV C
Страница 2: ......
Страница 14: ...Simrad SH80 X 851 164300 C Blank page...
Страница 61: ...Transceiver unit 45 851 164300 C Figure 13 Mounting the Transceiver Unit CD3110A...
Страница 186: ...Simrad SH80 170 851 164300 C 12 3 Installation drawings The SH80 installation drawings are provided on the next pages...
Страница 195: ...Installation remarks 179 851 164300 C Party Date Signature Party Date Signature Party Date Signature...
Страница 196: ...Notes...
Страница 197: ...Notes...
Страница 200: ......