Simrad SH80
102
851--164300 / C
9.7 Checking the hoisting/lower system
Introduction
The following set of procedures requires two persons. One person
must be stationed on the bridge to operate the sonar, while one must
stay in the sonar room to make sure the hoisting/lowering system
works properly.
Proper communication exists between the two locations is useful.
Note
Should any problems arise during the operation, the person in the
sonar room must press the red button marked
0
on the motor
overload switch
S301
in the Motor Control Unit.
→
Refer to figure 31 on page 90.
The following two procedures must be performed simultanously
by the person on the bridge and the person in the sonar room.
•
Checking the bridge functions
shall be performed on the bridge
•
Checking the sonar room functions
shall be performed in the
sonar room.
To simplify the test, remove the applicable pages from this manual.
Preparations
Prior to the two main test procedures, observe the following
preparations.
1
Connect cable
C15
from the Transceiver Unit to the Sonar
Interface Unit.
Содержание SH80 - REV C
Страница 2: ......
Страница 14: ...Simrad SH80 X 851 164300 C Blank page...
Страница 61: ...Transceiver unit 45 851 164300 C Figure 13 Mounting the Transceiver Unit CD3110A...
Страница 186: ...Simrad SH80 170 851 164300 C 12 3 Installation drawings The SH80 installation drawings are provided on the next pages...
Страница 195: ...Installation remarks 179 851 164300 C Party Date Signature Party Date Signature Party Date Signature...
Страница 196: ...Notes...
Страница 197: ...Notes...
Страница 200: ......