Start--up procedures
85
851--164300 / C
9 START-UP PROCEDURES
9.1 Introduction
The procedures in this chapter shall be carried out once all the
hardware units have been installed, and the cabling is finished.
When you perform the procedures, make sure that you only
perform those tasks described, and in the given order. Also, check
off every item in the procedure as you carry on.
The following procedures shall be performed:
→
Checklist before start-up commences, page 86.
→
Staring the stand-by power supply, page 87.
→
Staring up the Hull Unit, page 89.
→
Starting the wheelhouse units, page 95.
→
Checking the Operator Panel, page 97.
→
Checking the hoisting and lowering system, page 102.
→
Starting up the Transceiver Unit, page 108.
→
Self-noise test, page 110.
→
System start-up, page 111.
→
Alignment of the sonar picture, page 116.
→
Defining own ship parameters, page 118.
Содержание SH80 - REV C
Страница 2: ......
Страница 14: ...Simrad SH80 X 851 164300 C Blank page...
Страница 61: ...Transceiver unit 45 851 164300 C Figure 13 Mounting the Transceiver Unit CD3110A...
Страница 186: ...Simrad SH80 170 851 164300 C 12 3 Installation drawings The SH80 installation drawings are provided on the next pages...
Страница 195: ...Installation remarks 179 851 164300 C Party Date Signature Party Date Signature Party Date Signature...
Страница 196: ...Notes...
Страница 197: ...Notes...
Страница 200: ......