Hull unit
41
851--164300 / C
4.6 Installation check-list
Refer to section
Sonar room requirements
when you fill in the
following check list.
INSTALLATION CHECK--LIST
YES
NO
Are the access hatches satisfactory?
Is the heating satisfactory?
Is the insulation satisfactory?
Is the ventilation satisfactory?
Is a bilge pump installed?
Is the lighting satisfactory?
Is the sonar room suitably decked?
Is the mechanical support of the hull unit satis-
factory?
Table 2 Hull unit installation check list
If the answer to any of these questions is
NO
, note the deficiencies
in the
Installation remarks and signature
.
→
Installation remarks and signatures
are found on page 178.
Содержание SH80 - REV C
Страница 2: ......
Страница 14: ...Simrad SH80 X 851 164300 C Blank page...
Страница 61: ...Transceiver unit 45 851 164300 C Figure 13 Mounting the Transceiver Unit CD3110A...
Страница 186: ...Simrad SH80 170 851 164300 C 12 3 Installation drawings The SH80 installation drawings are provided on the next pages...
Страница 195: ...Installation remarks 179 851 164300 C Party Date Signature Party Date Signature Party Date Signature...
Страница 196: ...Notes...
Страница 197: ...Notes...
Страница 200: ......