Transducer Installation
Wood or polyester hull
A fairing (A), made by the shipyard, is placed between the
transducer and the hull. It is required in order to adapt for the
deadrise angle of the hull, and will also house a cable service
loop (B). The fairing is made from wood, polyester or steel, and
should have the same outline dimensions as the transducer. Use
tarred felt (H) between the fairing and the hull. Remember to
create an air outlet (E) on the fairing, and to
fi
ll the bolt holes
with a
fi
lling compound to ensure a smooth transducer surface.
(CD17007B)
B
C
I
D
A
A
E
G
1
2
5
4
4
4
3
H
F
(A) = Fairing
(B) = Cable service loop
(C) = Filling compound
(D) = Inclination angle
(E) = Air outlet
(F) = Forward
(G) = Shim (wood)
(H) = Tarred felt
(I) = Threaded rod with nuts
and washers, or bolt
(1) = Steel conduit
(2) = Stuffing tube
(3) = Washer
(4) = Rubber gasket
(5) = Packing nipple
304699/A
117
Содержание ES60 - DATASHEET REV A
Страница 2: ......
Страница 10: ...Simrad ES60 8 304699 A...
Страница 155: ...Simrad transducers GPT connection Single beam normal power transducer on page 68 304699 A 153...