Chapter 2. Installation/System Checkout
2-16
Depleted Battery Cutout
For depleted battery cutout, remove the jumper shown in
Figure 2-18 from the MSB. If you are using an Expansion
Power Supply (EPS), you must also remove the depleted
battery cutout jumper from the EPS. (When programming
the panel, make sure to enable the Depleted Battery Cutout
system option.)
Safety Ground/Ferrite Bead
Proper operation and protection against transient energy per
UL 864 and ULC-S527 requires connection of safety ground
wire to cabinet chassis as shown in Figure 2-19.
In addition, a ferrite bead must be attached to the incoming
AC power line as shown in the figure. Wrap the Line and
Neutral legs of the power line twice through the ferrite bead.
System Power-Up and
Checkout
Use the following procedure to apply AC and battery power
to the 4008.
On power up, the 4008 performs the following:
•
Displays revision of boot-loader software
•
CPU self test
•
Link Scan - checking for a programming unit connec-
tion
•
Memory Test - Verifying system and job-specific soft-
ware
•
Startup - 4008 Exec startup
If the 4008 successfully completes its start up self-test, it
will indicate a warm or cold start trouble, which clears when
acknowledged. If there are no other troubles in the system, a
message similar to the following is displayed:
SYSTEM NORMAL
12:00 am 03/09/03
If other troubles exist in the system, the following is dis-
played:
Pressing the <TROUBLE ACK> key allows the operator to
acknowledge the troubles (silencing the panel sounder) and
scroll through the troubles on the active Trouble List.
If the 4008 self-test fails, the panel displays an error code
and waits 30 seconds before attempting a restart.
Acceptance Testing
When you are finished with the original installation, pro-
gramming and all modifications, conduct a complete opera-
tional test on the entire installation to verify compliance with
applicable NFPA standards and Local Codes. Testing should
be conducted in the presence of a representative of the
Authority Having Jurisdiction (AHJ), and the customer's
representative. Follow procedures outlined in Chapter 10
"Inspection, Testing, and Maintenance" of NFPA standard
72-2002 and as dictated by local codes.
Figure 2-18 Location of Depleted Battery Jumper
Figure 2-19 Safety Ground and Ferrite Bead
LINE
NEUTRAL
BATT
EPS
+
-
+
-
Remove this
Jumper
FIRE
SUPV
TRBL
00
00
02
Technical Manuals Online! - http://www.tech-man.com
firealarmresources.com
Содержание TrueAlarm 4008- 9121
Страница 1: ...Technical Manuals Online http www tech man com firealarmresources com...
Страница 6: ...Technical Manuals Online http www tech man com firealarmresources com...
Страница 10: ...Technical Manuals Online http www tech man com firealarmresources com...
Страница 34: ...Technical Manuals Online http www tech man com firealarmresources com...
Страница 58: ...Technical Manuals Online http www tech man com firealarmresources com...
Страница 68: ...Technical Manuals Online http www tech man com firealarmresources com...
Страница 72: ...Technical Manuals Online http www tech man com firealarmresources com...
Страница 80: ...Technical Manuals Online http www tech man com firealarmresources com...
Страница 85: ...Technical Manuals Online http www tech man com firealarmresources com...
Страница 86: ...Technical Manuals Online http www tech man com firealarmresources com...