Tool management
6.1 Setting tool management parameters on the HMI
HMI Advanced (IM4)
Commissioning Manual, 03/2009, 6FC5397-0DP10-3BA0
171
Creating PLC data:
●
When all magazines, buffers and loading points (for all channels / TO areas) are entered,
the configuration data must be created for the PLC and transferred to it. To do this, press
the "PLC data" softkey.
Note
The next time the PLC is booted, the message "Deleting DBxx in PLC..." may appear. In
this case, the specified DB is deleted via STEP 7. As an alternative, a suitable PLC
archive can also be loaded.
6.1.2
How to parameterize a buffer
Buffer
Buffer locations are spindles, grippers, loaders and transfer locations. All buffer locations are
managed in an internal buffer magazine with the number 9998.
In this screen, new buffer locations can be defined and existing ones displayed.
Figure 6-2
Start-up: Buffer
Содержание SINUMERIK
Страница 6: ...Preface Base software and HMI Advanced 6 Commissioning Manual 03 2009 6FC5397 0DP10 3BA0 ...
Страница 24: ...Introduction 1 5 Limits of data management HMI Advanced IM4 18 Commissioning Manual 03 2009 6FC5397 0DP10 3BA0 ...
Страница 96: ......
Страница 338: ...List of Abbreviations B 1 Abbreviations HMI Advanced IM4 332 Commissioning Manual 03 2009 6FC5397 0DP10 3BA0 ...
Страница 464: ...Programming 2 8 Operators Expanding the user interface 2 114 Commissioning Manual 11 2006 6FC5397 0DP10 0BA0 ...
Страница 562: ...Index Expanding the user interface Index 4 Commissioning Manual 11 2006 6FC5397 0DP10 0BA0 ...
Страница 566: ...Table of contents Online Help HE1 4 Commissioning Manual 11 2006 6FC5397 0DP10 0BA0 ...
Страница 598: ...Online Help HE1 Commissioning Manual 11 2006 6FC5397 0DP10 0BA0 36 ...
Страница 638: ...References for text generation Generating target language texts TX2 40 Commissioning Manual 11 2006 6FC5397 0DP10 0BA0 ...
Страница 672: ...Commissioning a system 1 4 BIOS settings PCU Basesoftware IM8 32 Commissioning Manual 03 2009 6FC5397 1DP10 4BA0 ...