7
OPERATION
8020065-ZSP4/2017-08-10|SICK
O P E R A T I N G I N S T R U C T I O N S | Master Data Analyzer
Subject to change without notice
74
7.2.4
Moving the measurement gantry to a start position
The measurement gantry must be located in the start position before the first
measurement.
▸
If you haven’t already done so, move the measurement gantry to the start position
using the handles.
Fig. 43: Measurement gantry in start/end position