20
8020216/19YN/V3-0/2020-12| SICK
O P E R A T I N G I N S T R U C T I O N S | DUSTHUNTER SP100 Ex-3K
Subject to change without notice
2
FOR YOUR SAFETY
Correct project planning
●
Basis of this Manual is the delivery of the device according to the preceding project
planning (e.g., based on the SICK application questionnaire) and the relevant delivery
state of the device (see delivered System Documentation).
▸
Contact SICK Service if you are not sure whether the device corresponds to the state
defined during project planning or to the delivered system documentation.
Special local conditions
In addition to the information in these Operating Instructions, follow all local laws, technical
rules and company-internal operating directives applicable wherever the device is installed.
Read the Operating Instructions
▸
Read and observe these Operating Instructions.
▸
Observe all safety information.
▸
If there is something you do not understand: Contact SICK Service.
Retention of documents
These Operating Instructions must be:
▸
Available for reference.
▸
Passed on to new owners.