O P E R A T I N G I N S T R U C T I O N S | DUSTHUNTER SP100 Ex-3K
Subject to change without notice
6
ASSEMBLY
6
Assembly
Carry out all assembly work onsite. This includes:
▸
Fitting the flange with tube,
▸
Fitting the control unit.
6.1
Assembly information
6.1.1
Proper assembly
6.2
Preparing the measuring point
The operator is responsible for preparing the measuring point
.
Basis for determining the
measuring point:
●
Preceding project planning
●
Regulations of local authorities
Responsibility of the operator
●
Determining the measuring point
●
Carrying out any necessary structural changes
●
Determining the suitable purge gas
●
Ensuring uninterrupted purge gas supply
6.3
Scope of delivery
Check the scope of delivery according to the order confirmation.
CAUTION:
Danger during assembly work
Improper installation can lead to injuries.
▸
Observe the relevant safety regulations as well as safety notices during all assembly
work.
▸
Only carry out assembly work on systems with hazard potential (hot or aggressive
gases, higher internal duct pressure) when the system is at a standstill.
▸
Take suitable protection measures against local or plant-specific hazards.
WARNING:
Risk of injury through inadequate fastening of the device
Inadequate fastening can cause the device or device components to become detached
from the installation site and injure people if they fall down.
▸
Consider the device weight specifications when planning the fitting supports.
▸
Take possible vibration loads into account when choosing the fixtures.
▸
Before starting assembly, check the condition and load-bearing capacity at the
installation location.