O P E R A T I N G I N S T R U C T I O N S | DUSTHUNTER SP100 Ex-3K
Subject to change without notice
ASSEMBLY
6
6.4.1.1
High-temperature version
Fitting the measuring probe NL 435 mm
Fig. 23: Fitting the flange with tube (all dimensions in mm)
Shown for high-temperature version, nominal length 435 mm
Fitting the measuring probe NL 735 mm
Fig. 24: Fitting the flange with tube (all dimensions in mm)
Shown for high-temperature version, nominal length 735 mm
High-temperature version
●
Fitting on a steel duct, brick stack and on a thin-walled duct is the same as for the
standard version.
NOTICE:
High-temperature version
Temperature damage can occur on the sender/receiver unit when fitted without a flange
with tube.
▸
The flange inner diameter must be 70 mm otherwise correct purging is not possible.
▸
Only fit the measuring probe in the duct as far as necessary (see above measure
40 mm) to avoid temperature damage.
Flange with tube
Duct
Purge gas
* The clearance to the flange must be
sufficient for a weather hood housing to be
fitted if necessary (at least 40 mm).
Flange with tube
Duct
Purge gas
* The clearance to the flange must be
sufficient for a weather hood housing to be
fitted if necessary (at least 40 mm).