Maintenance
IDM 510-129-1
36
English language
Operation and maintenance manual
4°
10.
Bring the column to a horizontal
position.
–
Insert the shim E under the
column to keep it horizontal.
5°
11.
Slightly loosen the nuts
F
.
12.
Adjust the tension of chain
G
by
means of the adjusting system
H
.
Important
Do not overtighten so as not to
cause any malfunctioning.
13.
Tighten the nuts
F
.
6°
14.
Lift the column to its vertical po-
sition.
15.
Introduce and tighten the
screws
D
.
16.
Remove the lifting device.
17.
Re-install the guards
K-W
.
7°
18.
Install the component
B
and
lock it in place with the fasten-
ing elements
A
.
19.
Install the reel holding carriage
(See “Disassembly and re-as-
sembly of the reel holding car-
riage”).
Important
Only for reel holding carriages
of type PW
20.
Install the pressing roller (See
“Disassembly and re-assembly
of the Pressing Roller”).
–
At the end of operations,
check that there are no tools
or other material near the
moving parts or in danger-
ous areas.
21.
Start the machine and make
sure that the operation has
been carried out properly.
Содержание ProWrap 16_H_FM
Страница 14: ...Safety information IDM 510 004 5 12 English language Operation and maintenance manual...
Страница 84: ...Control system IDM 510 140 0 82 English language Operation and maintenance manual...
Страница 102: ...Disposal and scrapping IDM 510 106 0 100 English language Operation and maintenance manual...