background image

AeroLift 100 / 150

Installation & Operating Instructions

 

Draper, Inc.  |  411 S. Pearl St. Spiceland, IN 47385 
draperinc.com  |  765.987.7999  |  800.238.7999  

© 2018 All Rights Reserved 

FORM: AeroLift100_150_Inst18

If you encounter any difficulties installing or servicing your AeroLift 100 or 150, call 

your dealer or Draper, Inc. in Spiceland, Indiana, 765-987-7999 or fax 765-987-7142.

 Caution: 

1

  Read instructions completely before proceeding. Follow instructions carefully.  

  Installation contrary to instructions invalidates warranty.

2

  Do not obstruct operation of AeroLift 100 or 150 with fingers or any other  

  object. Serious injury or damage could result.

3

  It is not uncommon to overheat the motor during initial installation when  

  setting limits. The motor is thermally protected and will stop working  

  temporarily. DO NOT physically pull the unit down when this occurs. Once it  

  has cooled to a safe temperature, it will begin operating again.

4

  The AeroLift 100 and 150 are designed to accommodate ceiling suspended  

  equipment. Equipment should not be allowed to rest on ceiling closures  

  during operation (see “Installing Projector”).

5

  Entire bottom of unit must be unobstructed to permit proper operation.

6

  Unit must be installed level (use a carpenter’s level).

7

  Unit operates on 110-120V AC 60 Hz. current.

Note:

 

Unit has been thoroughly inspected and tested at factory and found to be 

operating properly prior to shipment.

Planning

1

  Based on screen location and projector specifications, determine proper  

  position for projector installation.

2

  Confirm that there is adequate space for installation and operation. Minimum  

  clearance above ceiling level varies according to height of projector, projector  

  mounting bracket, optional ceiling closure and optional Environmental Air  

  Space Housing.

3

  Arrange to provide service access to the unit.

4

  Total maximum capacity of AeroLift 100 is 100 lbs.; capacity for AeroLift 150 is  

  150 lbs. (including closure, projector and bracket).

As Soon As AeroLift Arrives

1

  Open carton and inspect for damage.

2

  Locate the following parts:

  A. The unit itself

  B. Controls  

  C. Any optional equipment

Test lift 

prior to installation

.

Electrical Connections

Unit operates on 110-120V, 60 Hz. AC current. The AeroLift 100 and 150 are 

shipped closed. After hanging the unit, make sure power is off and temporarily 

connect the unit to power and to a switch, so the unit can be lowered to allow 

access inside.

Please note: Make sure electrical supply has been disconnected before 

attempting to connect AeroLift to electricity.

Terminal strip for field connections is located inside a junction box on the end of 

the unit. Unit is shipped with internal wiring complete to the terminal strip. Once 

the unit has been lowered, 

turn off power 

and remove the J-box cover. The 

terminal strip is attached to the cover. Disconnect temporary pigtail from unit, then 

complete permanent wiring to electricity and to switches. Wire to connect unit 

to power supply and to switches should be furnished by installer. Connections 

should be made in accordance with wiring diagram, and wiring should comply with 

national and local electrical codes. All operating switches should be “off” before 

power is connected. AeroLift should be operated and checked prior to installing 

projector and/or optional ceiling closure.

AeroLift 100 

(with Closure panel)

AeroLift 150 

(with Closure panel)

Projector can be installed as shown or

 turned 90° depending on projector size.

Projector can be installed as shown or

 turned 90° depending on projector size.

Содержание AeroLift 100

Страница 1: ...height of projector projector mounting bracket optional ceiling closure and optional Environmental Air Space Housing 3 Arrange to provide service access to the unit 4 Total maximum capacity of AeroLift 100 is 100 lbs capacity for AeroLift 150 is 150 lbs including closure projector and bracket As Soon As AeroLift Arrives 1 Open carton and inspect for damage 2 Locate the following parts A The unit i...

Страница 2: ...to 110 120V Single Station Control AeroLift stops when switch is released and may be restarted in either direction Factory adjusted limit switches automatically stop AeroLift when up or fully down Optional 24V Control Three button up stop down switches stop at any point desired operate in any sequence Factory adjusted limit switches automatically stop AeroLift when fully up or fully down Optional ...

Страница 3: ...injury Please Note If load is off center of pan you may need to adjust the pitch of the fabric rollers One setscrew is provided on each end of both fabric rollers see above drawing Use these to adjust roller pitch to keep entire fabric panel taut so load is evenly distributed Use 1 8 hex key to adjust Installing Optional Environmental Air Space Housing The Environmental Air Space Housing is shippe...

Страница 4: ... PROJECTOR OUTLET MOTOR BK WH L1 N GRD BL 14 AWG BL BL Location of key operated On off switch if furnished Dashed Wiring By electrician To 110 120 Vac Line RD COM DOWN UP COM DOWN UP COM DOWN UP IR Eye Input Low Voltage Trigger 3 28 VDC RS232 485 Inputs Outputs Receiver Button 3 Button Wall Switch DOWN Black COM White UP Red Wall Switch Electrically Straight Data Cable to more LVC IV modules A max...

Отзывы: