Maintenance
IDM 510-129-1
38
English language
Operation and maintenance manual
Replacing the rotating platform wheels (standard version)
The operation must be carried out by the maintenance technician or by per-
sonnel with suitable competences, skills and knowledge.
Make sure to fulfil the required requirements in order to work under safe con-
ditions.
– This service should be carried out with the reel holding carriage lowered and the
machine safely at a stop.
– The figure shows the points of intervention and the description shows the proce-
dures to be adopted.
1.
Mark the intervention area and
prevent access to the devices
that, if activated, may cause
unexpected hazards and jeop-
ardize the safety level.
Attention
Warning
Always wear suitable personal
protective equipment in order to
avoid safety and health hazards.
2.
Rotate main disconnector to
position
“O”
(OFF) to deacti-
vate the power supply.
3.
Loosen the screws
A
.
4.
Fit the eyebolt on the rotating
platform.
5.
Attach the lifting device to the
eyebolt.
6.
Lift and move the rotating plat-
form on the side.
7.
One at a time, remove all the
wheels
B
.
8.
One at a time, fit all the new
wheels.
Important
Replace the components ONLY
with GENUINE SPARE PARTS or with other components of equivalent design
and functional specifications.
9.
Adjust the platform in its original position.
10.
Remove the lifting device.
11.
Remove the eyelet.
12.
Tighten the screws
A
.
–
At the end of operations, check that there are no tools or other material
near the moving parts or in dangerous areas.
13.
Start the machine and make sure that the operation has been carried out proper-
ly.
Содержание ProWrap 16_H_FM
Страница 14: ...Safety information IDM 510 004 5 12 English language Operation and maintenance manual...
Страница 84: ...Control system IDM 510 140 0 82 English language Operation and maintenance manual...
Страница 102: ...Disposal and scrapping IDM 510 106 0 100 English language Operation and maintenance manual...