51(77)
3.3 Installation of Feed Hopper
1) Reserve M12 screwed holes on feed hopper to fix two lifting eyes.
2) Lift up feed hopper and lay it on top of crushing chamber carefully to make it
match well with crushing chamber and justify with its fixing holes.
3) Lock tightly the external hex bolts of feed hopper. (torque: 220Nm).
Picture 3-2: Installation of Feed Hopper
3.4 Installation of Shield
Before installing shield, make sure finishing feed hopper installation first.
1) Place shield plate on the side to match whole sites.
2) Lock screws at the front and back ends.
Picture 3-3: Installation of Shield
Содержание SGS-6080S
Страница 1: ...SGS S Single shaft Shredders Date May 2014 Version Ver B English...
Страница 2: ......
Страница 8: ...8 77...
Страница 24: ...24 77 2 3 3 Cutting Chamber Structure Picture 2 8 Cutting Chamber Structure...
Страница 31: ...31 77 2 3 12 Pushing Device Assembly Picture 2 12 Pushing Device Assembly...
Страница 34: ...34 77 2 3 15 Hydraulic System 2 3 15 1 Principle of Hydraulic System Picture 2 14 Principle of Hydraulic System...
Страница 37: ...37 77 2 4 Wiring Diagram 2 4 1 Wiring Diagram Picture 2 16 Wiring Diagram...
Страница 38: ...38 77 2 4 2 Control Wiring Diagram Picture 2 17 Control Wiring Diagram 1...
Страница 39: ...39 77 Picture 2 18 Control Wiring Diagram 2...
Страница 40: ...40 77 2 4 3 Electrical Components Layout Picture 2 19 Electrical Components Layout 1...
Страница 41: ...41 77 Picture 2 20 Electrical Components Layout 2...