7
Startup
Startup procedure
Manual – PROFINET IO Interfaces, Field Distributors
83
15. Switch on the DC 24 V supply voltage for the MFE.. fieldbus interface and the
MOVIMOT
®
inverter.
ð
Startup has been completed successfully when the "MS" LED at the
MFE.. fieldbus interface lights up green.
ð
The red "SYS-F" LED is not lit.
16. Configure the MFE.. fieldbus interface at the PROFINET IO controller.
In conjunction with PROFINET IO, no further settings are required on the drives. The
PROFINET IO is configured entirely using software tools. For more information about
configuration, refer to chapter "PROFINET IO configuration" in the manual.
22870857/EN – 12/2016