Doc. MI004620-I
S6001 Pump controller
Rev. 0
www.seneca.it
14 /
122
ALL RIGHTS RESERVED. NO PART OF THIS PUBLICATION CAN
BE REPRODUCED WITHOUT PREVIOUS AUTHORIZATION.
User Manual
Find below further information on how the LEDs operate:
At power-up, during the loading phase, all the LEDs, with the exception of the COM port LEDs, are ON; when
the system is fully operational, the operation LED flashes.
The 3G+ signal power LED 1 flashes, in sync with the operation LED, in the following situations:
−
the GSM/3G+ network is not available (or the signal level is too low);
−
the SIM is not inserted;
−
the modem is not present.
LED
Status
Meaning
3G+ PWR Green
ON
The 3G+ modem is ON
STAT yellow
ON
Not recorded on the GSM network
Slow flashing
Recorded on the GSM network
Fast flashing
PPP connection active
Tab. 5 RTU signalling LED - Modem
1.6.2 HMI
1,2,3
P1
P3
P2
Fig. 3 HMI
The HMI
(Fig. 3 on page 14)
is equipped with:
Power supply
(1,2,3 -
Fig. 3 on page 14)
,
communication ports
(P1 -
Fig. 3 on page 14)
,,
on which more detailed information is provided in the following tables.
Содержание S6001
Страница 1: ...ORIGINAL INSTRUCTIONS USER MANUAL S6001 Pump controller...
Страница 2: ......