68
EQJW146F002 EN
Systems
System Anl 11.5
BE
BA
AE
RK
RK1/10Vout RüF1
VF1
UP1
AF1
RF1
WW
KW
ZP
RüF2
SF1
RK2
Note
DHW circuit with adjustable valve position for storage tank
charging in absolute priority operation. By using RüF2, the
ready-adjusted valve position is subject to the return flow tempera-
ture limitation.
Default setting
CO1 > F01
- 0 (without RF1)
CO1 > F02
- 1 (with AF1)
CO4 > F02
- 0 (without SF2)
CO4 > F03
- 1 (with RüF2)
Содержание EQJW146F002
Страница 2: ...2 EQJW146F002 EN ...
Страница 125: ...EQJW146F002 EN 125 Installation 1 2 2 5 3 4 5 62 15 41 57 Panel mounting Wall mounting Rail mounting Fig 9 Installation ...
Страница 158: ...158 EQJW146F002 EN ...
Страница 159: ......