MODULAR SUNWAY TG
TE OD
INSTALLATION GUIDE
28/
139
Rev. 03
– 01/06//2018
Configuration featuring
quadruple converter, hybrid configuration
AC
Modules
DC
Modules
MPPTs
1
4
2
The two DC sections are connected
2-by-2 in Master/Slave, mode; each
pair operates independently of each
other.
4.1.1. Earth bonding of the PV field
Input from the PV field may support floating fields or positive/negative earthed fields. Please refer to section
4.18.1.
All configurations described in the section above are applicable to earthed fields provided that a winding of
the elevator transformer separate for each MPPT in the output transformer is available.
4.2.
Cabinet front controls
Figure 6: Controls on the front of the SUNWAY TG TE
The following controls and devices are located on the front door of the inverter cabinet (the relative ID codes
used in the Electrical and Mechanical Diagram are provided in the brackets):
4.2.1. AC section
Key-operated selector switch: door switch Enabling/Disabling (41SA1)
This key-operated selector switch enables/disables the door closure safety microswitches. If the safety
microswitches are activated, door opening will open the switches on the PV field side and grid side.