![Santerno SUNWAY TG1200 1000V TE OD Скачать руководство пользователя страница 105](http://html1.mh-extra.com/html/santerno/sunway-tg1200-1000v-te-od/sunway-tg1200-1000v-te-od_installation-manual_810313105.webp)
INSTALLATION GUIDE
MODULAR SUNWAY TG
TE OD
Rev. 03
– 01/06/2018
105/
139
•
Open the switch on the DC side of the converter.
•
Make sure that the inverter that hosts the DC-Parallel is powered by the AC grid supply only and that
the display/keypad is turned on.
•
Make sure that the key-operated selector switch 41SA1 is set to DISABLED.
•
Make sure that parameter C276 = Warning (Please refer to the Programming Guide).
•
Open the door of the DC input section and remove the cover protecting the fuse holders where
microswitch testing is to be carried out.
•
Extract each microswitch from its support.
•
Open the microswitch contact.
•
Check that the inverter display/keypad of the DC module where the signal control is being done
indicates “Warning”: W29 STR.FUSE KO.
Figure 69: Testing of DC-Parallel fuse status switch
Once the status switches have been checked, follow the instructions above in the reverse order.