108
Information shown in AS-Builtcheck is introduced follow:
Longitude (in direction of the line) is positive: expresses the point measured lies
between the start point and end point of the line.
Right latitude offset is positive: expresses the point measured is on the right of
the line.
H is positive: expresses the point measured is higher than the start point of the
line.
The height of start point of the line is always set as the reference height.
Soft Keys: F3 ([STAKE]): The program switches to Stake Out function.
F3 ([ShiftL]): Input a shift value to shift the line horizontally.
5.13.4 Stake Out
Here you can search or enter points to be staked out related to the measured
line.
STEPS
DISPLAY
Press STAKE to start to stake out.
【
Stake Out
】
PtID:
------
R.HT
1.5000 m
Ln
----.--- m
Of
----.--- m
H
----.--- m
All
DIST
CHECK
↓
Input the PtID of the point to stake out
and its prism height.
If the PtID entered exists, it will display
the position against the construction site.
If there
’re more than 1 points with the
same PtID, it will show a list to choose.
If the point does not exist, you will be
requested to input the coordinates
manually.
【
Stake Out
】
PtID:
3
R.HT
1.5000 m
Ln
1.971 m
Of
0.058 m
H
2.128 m
All
DIST
CHECK
↓
Collimate the prism and press DIST to
start measurement. It displays the
longitude offset, transversal offset and the
height offset between the point to
measure and the construction site.
Move the prism according to the
indications until all the offset values are 0
m.
【
Stake Out
】
PtID:
3
R.HT
1.5000 m
Ln
1.971 m
Of
0.058 m
H
2.128 m
All
DIST
CHECK
↓
X
----.--- m
----.--- m
----.--- m
----.--- m
-----.--- m
----.--- m
1.967 m
0.023 m
2.369 m
X
Содержание STS-750RC Series
Страница 1: ......
Страница 12: ...11 1 8 MENU TREE Menu F1 F4 Confirms the selected menu Press PAGE to view the next page ...
Страница 152: ......