106
Set the job.
Press ADD to add a new job.
Press OK to set the job you just selected
as the current job.
【
Setting Job
】
1/3
Job
:
A
Name
:
------
Date
:
2011.01.16
Time
:
16:50:28
ADD
OK
Press F1 to set a job again.
Press F2 to set the EDM
Press F3 to define a new construction
site.
Press F4 to call up the construction site
that is set last time.
Here, take
“Defining new site” as
example.
【
Programs
】
3/3
F1 Setting Job
F2 EDM Settings
F3 Defining new site
F4 Skips set-up
F1
F2
F3
F4
Input the starting PtID of the construction
site and its prism height.
Collimate the prism and press All (or
DIST + RECORD) to start measurement.
【
Defining new Site
】
Sight Meas Start Pt!
StartP
:
1
R.HT
:
2.000 m
:
----.--- m
Ⅰ
:
----.--- m Mem.
All
DIST
RECORD
↓
Input the end PtID of the construction site
and its prism height.
Collimate the prism and press All (or
DIST + RECORD) to start measurement.
【
Defining new Site
】
Sight Meas Start Pt!
StartP
:
1
End Pt
:
2
R.HT
:
1.500 m
:
----.--- m
Ⅰ
:
----.--- m Mem.
All
DIST
RECORD
↓
After defining the construction site, it
displays the stake out screen.
【
Stake Out
】
PtID:
------
R.HT
1.5000 m
Ln
----.--- m
Of
----.--- m
H
----.--- m
All
DIST
CHECK
↓
X
----.--- m
----.--- m
----.--- m