105
Input the ratio to cut or fill.
Then choose the left or right slope to
stake out.
【
Slope Stake Out
】
Left (1:n)
Cut
:
1.350
Fill
:
1.000
Right (1:n)
Cut
:
1.200
Fill
:
1.650
LEFT
RIGHT
Input the prism height.
Collimate the prism and press DIST.
【
Slope Stake Out
】
PtID
:
C100+10.0S
R.HT
:
2.000 m
△
LOff
:
----.--- m
△
TOff
:
----.--- m
Ⅰ
Mem.
All
DIST
RECORD
EDM
Note:
1) If the earth surface crosses the hinge point, the intersection cannot be calculated.
2) As the fill/dig value of calculated point is zero, therefore the fill/dig value is not
displayed.
5.13 CONSTRUCTION SITE STAKE OUT
This application allows defining a construction site by combining set-up of the
instrument along a construction line, measuring and stake-out points related to
the line.
After activating the application, you have 2 options:
a) New construction site
b) Continue with previous site (skips set-up)
5.13.1 Defining New Construction Site
STEPS
DISPLAY
Press F2 to start
Construction
on Page
3/3 of
Programs
.
【
Programs
】
3/3
F1 Roads
(9)
F2 Construction
(0)
F1
F2
Содержание STS-750RC Series
Страница 1: ......
Страница 12: ...11 1 8 MENU TREE Menu F1 F4 Confirms the selected menu Press PAGE to view the next page ...
Страница 152: ......