99
5.12.4 Defining Vertical Alignment
A vertical alignment consists of a series of intersections, including a chainage,
height and curve length. The length of start point and end point must be zero.
Chainage
1000
1300
1800
2300
Elevation
50
70
60
90
Curve Length
0
300
300
0
Intersections can be entered in any order. After entering one point data, press
ENT to save it and go to next inputting screen. Press ESC to quit without saving.
STEPS
DISPLAY
Press F2 to start to
Define VT Alignment
.
【
Roads
】
F1 Define HZ Alignment
F2 Define VT Alignment
F3 Stake Out Roads
F1
F2
F3
Input the chainage, elevation and curve
length. Then press NEXT.
The curve lengths of the start point and
end point should be 0.000 m.
Confirm to save the vertical alignment
data. The system will return to define the
next vertical alignment data.
【
Define VT AL
】
1/0
Chain.
:
1000.000 m
H/Z
:
12.000 m
Length
:
0.000 m
PREV
NEXT
SEARCH
↓
5.12.5 Editing Vertical Alignment Data
It is able to be applied to edit vertical alignment data. The operation steps are
similar to that of editing horizontal alignment.
Содержание STS-750RC Series
Страница 1: ......
Страница 12: ...11 1 8 MENU TREE Menu F1 F4 Confirms the selected menu Press PAGE to view the next page ...
Страница 152: ......